2010-6 Prestige Vent Supl.This document is intended to be used by a qualified heating contractor or servicetechnician. Read all instructions within t
Pre-Installation Requirements7DescriptionApproved 3” (80 mm) Flex Polypropylene Vent Adapters, Terminations and SupportsCentrotherm Eco Systems, LLC M
8Vent/Combustion Air Equivalent Lengths- For all venting applications, PVC/CPVC, AL29-4C®,SS or Polypropylene, the maximum allowable lengthshould not
9-Maintain 5/8" per foot slope back toward appliance onall horizontal runs of rigid polypropylene vent pipe.- The use of a wall plate is r
Pre-Installation Requirements10Combustion Air ContaminationIf the PRESTIGE combustion air inlet is located in anarea likely to cause or contain
Direct Vent Installation of Vent/Air Piping11SECTION II - DIRECT VENT INSTALLATIONOF VENT/AIR PIPINGA Direct Vent appliance utilizes uncontaminated ou
12Direct Vent Installation of Vent/Air Piping12" Min. [30.5 cm] Radial Distance12" [30.5 cm] (18” [ 45.7 cm] Canada)Above the HighestAnticip
13Direct Vent - Vent Installation - Through the Roof1. Vent and Combustion Air Penetration- Vent pipe penetration through combustible ornon-combu
14Direct Vent Installation of Vent/Air PipingVent Termination Bird ScreenVertical Vent Bird Screen InstallationFig. 4:Installer must install the f
15Direct Vent Installation of Vent/Air PipingThe combustion air inlet of the PRESTIGE is definedas being part of a direct vent system. It is not con-
16Direct Vent - Horizontal - SidewallThe installation must conform to the requirements ofthe authority having jurisdiction or, in the absenceof
Table of ContentsiPRODUCT AND SAFETY INFORMATIONDefinitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17Direct Vent Installation of Vent/Air Piping12” Min. - 24” Max. [ 30.5 cm - 61 cm]From Wall To Vent12" [30.5 cm] Min. Above Grade / Highest Ant
18Direct Vent Installation of Vent/Air Piping24” [ 61 cm]From Wall To Center-line of Vent12" [30.5 cm]Min. Above Grade/Highest Anticipated Snow L
194. The combustion air and vent pipe center lines mustbe a minimum of 12” [30.5 cm] apart as shown inFigs. 8 through 15 pages 17 & 18.
20Direct Vent - Vent Installation - Sidewall1. Vent and Combustion Air Penetration- Vent pipe penetration through combustible ornon-combustible w
21Direct Vent Installation of Vent/Air Piping Bird Screen Vent Termination Horizontal Vent Bird Screen Instal
22Direct Vent Installation of Vent/Air PipingFig. 20 shows one option for vent and combustionair terminations of multiple PRESTIGE boilers.E
23Direct Vent Installation of Vent/Air PipingDirect Vent - Vertical Vent and Sidewall CombustionAirThe installation must conform to the requirements
244. The following should be considered when deter-mining the location of the vent and combustion airtermination:a. Locate the vent terminat
25Termination Fittings 1. The vent and combustion air terminations must includea factory supplied “bird screen” installed as shown inFig. 4 p
26Category IV Installation of Vent/Air PipingSECTION III - CATEGORY IV (INDOOR AIR)INSTALLATION OF VENT/AIR PIPINGA Category IV appliance utilizes unc
Table of ContentsiiSECTION V - MANIFOLD COMBUSTION AIRManifold Combustion Air Option for Multiple Prestige Boilers . . . . . . . . . . . . . . . . 36
27Category IV Installation of Vent/Air Pipingd. Avoid locations where prevailing winds couldaffect the performance of the boiler or cause
28Category IV Installation of Vent/Air PipingCategory IV - Multiple Boiler Installation - Throughthe Roof1. On installations of multiple PREST
29Category IV Installation of Vent/Air Pipingc. Prevailing winds could cause freezing of fluecondensation and a buildup of water / ice on sur-r
30Category IV Installation of Vent/Air Piping 12" Min. - 24” Max.[30.5 cm - 61 cm] To Wall12" [30.5 cm] Min. Ab
31Category IV Installation of Vent/Air PipingCategory IV - Vent Installation - Sidewall1. Vent Penetration- Vent pipe penetration through combust
32Category IV Installation of Vent/Air PipingCategory IV - Multiple Boiler Installation - Sidewall1. On installations of multiple PRESTIGE boiler
33Installation RequirementsSECTION IV- INSTALLATION REQUIREMENTS3” to 2” (60 mm) Vent/Combustion Air TransitionThis section outlines the installation
343” to 4” (100 mm) Vent/Combustion Air TransitionThis section outlines the installation of Venting andCombustion Air for the PRESTIGE 60, 110, 175, 2
35Installation RequirementsVent and Combustion Air Piping Installation GuidelinesPVC/CPVC Vent System1. The installer should install the vent /
36Manifold Combustion AirSECTION V - MANIFOLD COMBUSTION AIRManifold Combustion Air Option for MultiplePrestige Boilers- Common combustion air ma
1Product and Safety InformationINSTALLERRead all instructions as outlined in this manualand in the boiler installation manual. Failure
37Commonwealth of MassachusettsSECTION VI - COMMONWEALTH OF MASSACHUSETTSInstallations with the Direct Vent TerminationElevation At or Below 4 fe
38Commonwealth of MassachusettsInstallations with the Direct Vent TerminationElevation Above 4 feet of Grade:The following instructions apply to
Notes:
Notes:
Additional quality water heating equipment available from ACV - Triangle TubeSMART INDIRECT FIRED WATER HEATERSTTP BRAZED PLATE HEAT EXCHANGERSTriang
2Pre-Installation RequirementsSECTION I - PRE- INSTALLATIONREQUIREMENTSRemoval of an Existing Boiler from a Common VentSystemDo not install the PR
3Pre-Installation RequirementsVent/Combustion Air Piping and MaterialsThe installation must conform to the requirements ofthe authority having jurisdi
4Pre-Installation RequirementsAL29-4C® Stainless Steel Vent Piping and FittingsThe following is a list of approved vent manufacturersand vent
Pre-Installation Requirements5DescriptionApproved 2” (60 mm) Rigid Polypropylene Vent Adapters, Terminations and SupportsCentrotherm Eco Systems, LLC
Pre-Installation Requirements6DescriptionApproved 4” (100 mm) Rigid Polypropylene Vent Adapters, Terminations and SupportsCentrotherm Eco Systems, LLC